Facts about Tune 

Tune lies 10 kilometres southwest of the Oseberg Field Center and is developed with subsea production installations tied into the Field Center.

The Tune field was discovered with an exploration well in 1995 and confirmed with an appraisal well in 1996.

Tune started producing just six years after its confirmation.

It has been developed with a sea-floor template with four wells tied into the Oseberg Field Center, and with hook-up possibilities for two additional satellite wells.

At plateau output, Tune will produce 3 billion cubic meters (Sm3) gas per year. Tune has an estimated productive lifetime of 15 years.

The gas volumes from Tune will be used for injection purposes to boost oil production pressure on Oseberg. The injected gas will later be recovered along with Oseberg gas and exported.

This contributes to more efficient recovery of resources from the Oseberg field.

Total development costs on the Tune project are NOK 3.2 billion (USD 453 million/EUR 413 million), including drilling of production wells.

More information about our operations in Norway .
Operator: StatoilHydro
Location: Blocks 30/5, 30/6 and 30/8, 10 kilometres southwest of the Oseberg Field Centre.
Production start: November 2002
Production: Oil and gas
Transport: Gas is transported via the Oseberg Gas Transport pipeline (OGT) to Heimdal, and then on to the UK and European continent. Condensate is transported via the Oseberg Transport System (OTS) to Sture.
Partners:
StatoilHydro 50 per cent
Petoro 40 per cent
Total 10 per cent