This is a preview of the print.
Return to normal view.

Facts about Sleipner East 

Sleipner East has been developed with the Sleipner A drilling and production platform, which is linked by bridge to a gas treatment platform and a flare stack.

Production started in August 1993.

As part of the Sleipner East development, the Loke and Sigyn gas and condensate satellite has been tied back to Sleipner A.

Condensate from Sleipner East is piped to Kårstø north of Stavanger for processing.

Gas from the field is transported in the Statpipe and Zeepipe to Emden and Zeebrugge in Belgium.

More information about our operations in Norway .
Operator: StatoilHydro
Production start: August 1993
Partners:
StatoilHydro 59.6 per cent
ExxonMobil Norge 30.4 per cent
Total E&P Norge 10.0 per cent
StatoilHydro | N-4035 Stavanger Norway | Tel: +4751990000 | Fax: +4751990050 | Copyright © StatoilHydro | Terms and conditions | Privacy policy | About this site | Feedback