The smallest platform in the Oseberg area, Oseberg Øst, lies 25 kilometres north-east of the Oseberg Field Centre.
The field is developed with an integrated drilling, accommodation and production platform with equipment for first phase processing.
The oil goes through second and third phase processing at the Oseberg Field Centre, before it is transported in an oil pipeline to the Sture terminal.
Maximum output is about 75,000 barrels of oil per day. Water and gas are injected into the reservoir to boost recovery.
The platform is dependent on supply ships when carrying out drilling operations.
Transport
The oil is transported by pipeline via the Oseberg Transport System (OTS) to the Sture terminal.