This is a preview of the print.
Return to normal view.

Peregrino 

The Peregrino field is located 85 km offshore Brazil in about 100 meters of water depth.



The first phase of the development includes two drilling and wellhead platforms and a ship-shaped floating production, storage and off-take unit (FPSO).

The platforms are tied back to the FPSO by flowlines and power umbilicals.
Project vividly showcases the sub-surface and reservoir management skills for which StatoilHydro is internationally recognized.

Applying skills such as produced water injection, horizontal wells and flow assurance to sustain the project over a longer-term, initial recovery rate has now been doubled to 20%. At this point, estimated recoverable resources are in the range of 300 - 600 million barrels of oil.

First oil expected for early 2011, and production should reach its plateau of 100,000 bbl/day within the first year.

Operator:
StatoilHydro (100%) 

Published 2007-12-20, 12:27 CET | Updated 2009-01-05, 08:46 CET
StatoilHydro | N-4035 Stavanger Norway | Tel: +4751990000 | Fax: +4751990050 | Copyright © StatoilHydro | Terms and conditions | Privacy policy | About this site | Feedback